Task & Inspection Lighting:
1,674 Products FoundFind a huge range of Task & Inspection Lighting at Farnell Spain. We stock a large selection of Task & Inspection Lighting, including new and most popular products from the world's top manufacturers including: Banner Engineering, Native Lighting, Brennenstuhl, CK Tools & Lightcraft
View
Buyer
Engineer
Manufacturer
Length
Module Lens Colour
Lamp Base Type
Supply Voltage VDC
Total Light Output
Light Source
Visual Signal Type
Lens Diameter
Supply Voltage
IP / NEMA Rating
Power Rating
Depth
External Height
Width
Operating Temperature Min
Operating Temperature Max
Product Range
Plug Type
Packaging
No Filter(s) Applied
0 Filter(s) Selected
| Compare | Price For | Quantity | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BANNER ENGINEERING | Each | 1+ € 581.570 | Total:€ 581.57 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 352.030 | Total:€ 352.03 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 352.030 | Total:€ 352.03 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 447.160 | Total:€ 447.16 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
Each | 1+ € 291.690 5+ € 281.080 10+ € 275.460 25+ € 269.840 50+ € 264.220 | Total:€ 291.69 Min: 1 / Mult: 1 | - | - | - | - | - | LED | - | 60mm | 30VDC | - | - | - | - | - | - | - | GS60 Series | - | |||||
BANNER ENGINEERING | Each | 1+ € 302.070 | Total:€ 302.07 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 657.680 | Total:€ 657.68 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 193.210 | Total:€ 193.21 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 599.390 | Total:€ 599.39 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 386.520 | Total:€ 386.52 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 451.940 | Total:€ 451.94 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 530.420 | Total:€ 530.42 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 670.750 | Total:€ 670.75 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 371.050 | Total:€ 371.05 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 361.540 | Total:€ 361.54 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 278.300 | Total:€ 278.30 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 443.600 | Total:€ 443.60 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 6,387.000 | Total:€ 6,387.00 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 312.780 | Total:€ 312.78 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 633.890 | Total:€ 633.89 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 206.910 | Total:€ 206.91 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 186.350 | Total:€ 186.35 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 317.530 | Total:€ 317.53 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 1,031.000 | Total:€ 1,031.00 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||
BANNER ENGINEERING | Each | 1+ € 493.550 | Total:€ 493.55 Min: 1 / Mult: 1 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||||

